China Procurement Desk

Hofmann Power Weight Fitment & Specs

Use the same drawing revision, dimensions and market requirements for every supplier quote. Record any missing measurement as an open field for review.

Send Your Spec

Prepare your RFQ

  • 01 Vehicle, wheel and drawing revision
  • 02 Size, load and mating interface
  • 03 Quantity, target market and port

Send the measurable fields

Buyer inputs and sample checks. Agree methods and acceptance limits before the sample review.
Part familyRFQ fieldsSample or document check
Hub centric ringsWheel-side OD and hub-side ID in mm, axial depth, chamfer, material and quantity by size. Example format: 66.6 mm OD × 57.1 mm ID.Compare measured OD and ID to the drawing tolerances using suitable calibrated gauges. Confirm full seating on both mating parts before approving the application.
Clip-on weightsRim flange section or profile code, weight increments in grams, clip material, wheel finish, pack and destination market.Compare mass on a suitable scale and check clip engagement in the agreed wheel fixture. Confirm separate profiles for variants that differ at the flange.
Adhesive weightsMass per segment, strip dimensions including backing, rim finish, application conditions and target market material rules.Measure clearance against a representative wheel. If an adhesion check is requested, record surface preparation, temperature, dwell time, method and limits in the test plan.
Fasteners and valvesSpecify thread pitch, seat form, engaged length and finish for fasteners. For valves, provide the valve hole size, pressure requirement and application.Confirm candidate drawing, mating seat or valve interface and the document scope for the exact SKU.

For a complete wheel or tire inquiry, add rim diameter and width, PCD, offset and center bore, or the tire size, load index, speed rating, tread and duty cycle. A wheel’s radial runout needs a defined reference surface and setup before comparing readings. A stock ring can share the required diameters and still differ at the chamfer. Compare the stock drawing against a custom drawing on axial depth, material, tolerance and sample cost before selecting a route.

Evidence before commitment

Supplier records

Request the legal entity, site and part revision on the quotation. If ISO or IATF documentation is supplied, match the certificate to the named site and scope as management-system evidence.

Sample check

Record part revision, date, measuring setup and operator on the sample record. Route changes to the buyer for acceptance and keep a reference sample if the buyer requests one.

Document scope

Request the issuer, tested model, report revision and target market. Where a rule applies, check its product scope with the qualified issuer or importer. A wheel approval has its own scope and cannot serve as evidence for a clip-on weight.